Workload & scenario design
Model transaction mix, concurrent users or arrival rate, ramp-up, think time, and data volume. Configure authentication, dynamic parameter correlation, and assertions that catch failed business transactions.

Understand how your application responds under load. QATitans uses JMeter and performance engineering methods to test throughput, response times, stability, and bottlenecks alongside wider non-functional quality checks.

We align our approach with your requirements, development process, and release goals.
Discuss your requirements ↗We translate usage patterns into repeatable workloads and measure performance against agreed targets. Results include the environment, data, traffic assumptions, and system evidence needed to interpret them.
Model transaction mix, concurrent users or arrival rate, ramp-up, think time, and data volume. Configure authentication, dynamic parameter correlation, and assertions that catch failed business transactions.
Run JMeter in CLI mode for load execution, with distributed generators when needed. Validate generator capacity and monitor the achieved request rate so a saturated test runner does not distort the results.
Measure p50, p95, and p99 response times, throughput, timeouts, and error rates. Correlate these with available CPU, memory, database, connection-pool, queue, and application telemetry.
Keep workloads and environment assumptions consistent when comparing changes. Separate warm-up from steady-state results, document bottleneck evidence, and retest fixes against agreed performance targets.
| Test type | What it examines | Key evidence |
|---|---|---|
| Load | Behavior at expected and peak demand | Latency percentiles, achieved throughput, and failures |
| Stress | Behavior beyond normal operating capacity | Saturation point, error behavior, and recovery |
| Spike | Response to sudden traffic increases and drops | Queue growth, scaling response, and stabilization time |
| Soak | Stability under sustained demand | Memory growth, resource exhaustion, and latency drift |
| Scalability | How capacity changes as resources are added | Throughput gains, limiting dependencies, and resource use |
| Recovery | Return to normal behavior after an agreed disruption | Recovery time, failed requests, and data consistency |
Correct functionality does not tell you how an application behaves under traffic, across devices, or when resources become constrained. Non-functional testing explores these quality attributes using explicit assumptions and agreed acceptance criteria. Results describe the tested conditions; they are not a guarantee of every production outcome.
Agree on representative journeys, expected load, supported environments, and the response-time or stability criteria relevant to the product.
Review the test environment, data volumes, workload mix, and observability. Record differences from production that may affect interpretation.
Run the agreed performance, load, stress, compatibility, usability, or other non-functional checks. Capture observations alongside system behavior.
Report bottlenecks and risks with supporting evidence. Retest selected changes to assess their effect against the same criteria.
Confirm the deliverables and level of detail in your project scope.
Load testing evaluates behavior under expected or specified demand. Stress testing explores what happens beyond expected operating conditions, including failure and recovery behavior.
No. Security checks have a defined scope and cannot establish that an application has no vulnerabilities. Any compliance requirement, specialist assessment, or certification must be discussed separately.